If you try to create a new scheduled outage with a specific date (from DATE1 till Date 2) you´ll get a java exception. As far as I can interpret the exception message the database gets a NULL instead of the month at the second part of the "till" date.
It´s not possible to create a specific date on my system at the moment.
If you try to create a new scheduled outage with a specific date (from DATE1 till Date 2) you´ll get a java exception. As far as I can interpret the exception message the database gets a NULL instead of the month at the second part of the "till" date.
It´s not possible to create a specific date on my system at the moment.
Thanks,
Flo